Sarasota Parks and Rec
Home MenuCompleted Projects
Completed Projects
Tennis Court Renovation
Before Repairs | After Repairs |
Replaced:
⭐ New Synthetic/Acrylic Surface
⭐ New Ultra-Heavy-duty Polypropylene Tennis Nets
Restrooms
Before Repairs | |
After Repairs |
Entry
Before Repairs | ||
After Repairs |
September 18, 2023 - Shiver me timbers! The new shipwreck-themed playground and splash pad at Bayfront Park are looking great! Even after Hurricane Idalia, the construction site sustained minimal damage thanks to the newly raised elevation of the area, and the grand opening is still on track for this Fall.
The plans include a shipwreck-themed playground with climbing features, shade structures, and a new splash pad built from the ground up. The entire play area will be graded to create a seamless connection, with shaded seating between the playground and splash pad for parents/guardians. The whimsical animal statues, longtime fixtures at the old splash pad and part of the City's extensive Public Art collection, will be incorporated into the play area landscaping.
Before Repairs |
After Repairs |
Playground Upgrades
Before Repairs | After Repairs |
Replaced:
⭐ Arched Bridge (Ages 5-12)
⭐ Hand Grips (Both)
⭐ Climber (Ages 5-12)
⭐ Blocks for Chin-up Bars (Both)
⭐ Surfacing (Ages 5-12)
Before Repairs | |||
After Repairs |
New Exercise Equipment Plots
Before Exercise Equipment | After Exercise Equipment |
Pavilion Removal
Before Removal | After Removal |
Bridge Repair
Before Repairs |
After Repairs |
After - Restrooms:
Before - Restrooms:
|
|
|
|
Before - Pavilion |
|
|
|
|
|
|
|
|
|
After - Pavilion |
|
Park Renovation
Before Repairs |
||
After Repairs |
⭐️ New Arch Swing Set
⭐️ New Pavilion with Table
⭐️ New Sidewalks
⭐️ New Landscaping
⭐️ New Basketball Goals
⭐️ New Benches
⭐️ New Turf Play Area
⭐️ New Cornhole Game
Circus Park Playground Surfacing
Before Repairs | |
After Repairs |
|
|
Before - Tennis Court |
After - Tennis Court |
|
|
Before - Basketball Court |
After - Basketball Court |
|
|
Before - Playground Fire Damage |
|
|
|
After - Brand New Playground |
|
Before - Basketball Court | After Basketball Court |
New, Resurfaced, Indoor Basketball/Pickleball Court
July 1, 2021
AUDITORIUM FOYER & RESTROOM RENOVATION
The new flooring at the Sarasota Municipal Auditorium really brings these spaces back to life! The above images reflect magnificent differences inside the foyer and restroom. Stay tuned for more updates throughout the month of July!
Sarasota Municipal Auditorium
801 N Tamiami Trail, Sarasota, FL 34236
June 11, 2021
RESTROOMS & TILE
The foyer renovations at the Sarasota Municipal Auditorium are looking fantastic!
Both restrooms have been gutted and new tile is placed. We can't wait to show you more updates this month, so stay tuned!
June 1, 2021
Park Renovation
Before Repairs | After Repairs |
⭐️ New Turf
⭐️ New Shrubs
⭐️ New Ground Cover
⭐️ Irrigation Repairs
⭐️ Relocation of the Dog Bag Waste Station
Before Repairs After Repairs
Tony Saprito Fishing Pier
The pier, located adjacent to the John Ringling Causeway Bridge, underwent a comprehensive rehabilitation with a new concrete top deck installed and concrete pilings, caps, and light poles retrofitted. Americans with Disabilities Act-compliant railings also were installed plus six benches and three shade structures to provide relief from the intense Florida sun.
New pressure-treated composite planks are now incorporated into the deck at the foot of the pier where the surf from Sarasota Bay is strongest. To protect the structural integrity of the pier, the planks are designed to pop out during strong wave action and remain attached to the pier.
The makeover pays tribute to Sarasota Bay through creative sea life art designs placed along the railings, plus a visual reminder “Protect The Bay” imprinted at the end of the pier.
The City also partnered with Sarasota County to install a new Automated Rainfall Management System (ARMS) able to measure wind speed and direction, atmospheric pressure, temperature, and precipitation.
Construction started in November 2020 and concluded in April 2021. The rehabilitation project was funded through the voter-approved penny surtax and is expected to further extend the pier’s longevity.
Saprito Pier opened in 1979 and remains a popular destination for fishing, walking, and enjoying a beautiful sunset on the bay.
Fishing Pier
Before Repairs | After Repairs |
ADA Pavement Connector
Before Repairs | After Repairs |
Playground Surfacing
Before Repairs | After Repairs |